As of 9 July 2010
Phase A, C & D Design $5,700
Phase A Complete ($850.00)
Site Preparation $479,979
Memorial design and concept; Black granite wall panels carved as depicted in artist drawings; All lettering, engraving, etching and finish work of granite panels; The installation of the black granite wall panels; The installation of the bronze statue; Design drawing needed for lettering; Granite caps and inserts used in signage wall (Muldoon Memorials) $201,763
Bronze statue of Daniel Boone (Wyatt Gragg) $84,408
Pooless water feature design and installation $15,000
NPS Type plaques for casualties and history (10) $25,000
Total $811,851
15% Contingency $121,778
Grand Total 933,628.22